Why the deposit schedule matters more than the sticker price
Oasis Hallandale is a mixed-use development on Hallandale Beach Boulevard with two residential towers, and its published materials are unusually varied. Different sources give different price ranges, addresses, delivery years and even developer names, because the project has been marketed over several years and through several channels. For a buyer who earns on an uneven schedule, such as a professional athlete with a contract cycle, a signing bonus or an off-season window, the practical question is rarely just what a unit costs. It is how much cash must be available, and on what dates, between reservation and closing.
New construction front-loads capital in a way a resale purchase does not. A buyer commits to a deposit structure long before receiving keys, and that capital is committed for the duration of construction. At Oasis Hallandale the answer also depends on which tower you are looking at. According to REHUB Miami's 2026 guide to the project, the West Tower has received its full temporary certificate of occupancy and closings have begun, while the East Tower topped out in March 2026 and is expected to be completed in 2027. Those two positions imply very different payment experiences, which is why this guide separates them.
What the public materials say about the deposit
The most specific deposit language in the supplied research comes from an early data sheet. A Condo Hotel Center data sheet for Oasis Hallandale, uploaded to the broker's website in January 2020 according to its web address, states that the total deposit will be 40 percent of the purchase price, broken down in installments. The excerpt available to us cuts off before the installment dates and percentages, so we cannot reproduce the schedule itself. That sheet also predates construction of the residential towers, so it should be read as a historical marker of how the project was structured at launch, not as a current offer.
For scale, and purely as arithmetic, 40 percent of a hypothetical $1 million purchase price would be $400,000 in total deposits across the installment schedule. This is an illustration, not a quote for any unit. A separate listing page from South Florida Realtor advises buyers to verify current availability, deposit schedule, HOA budget, taxes, insurance and parking before reserving. That is sound advice, and it reflects the fact that no single public page presents a current, unit-by-unit payment ledger. The developer's own site, hallandaleoasis.com, focuses on design and amenities and does not publish a deposit table in the material we reviewed.
The practical takeaway is to treat 40 percent as a planning anchor to be confirmed in writing, not as a final number. Ask the sales team for the current deposit schedule for your specific residence and tower, including the amount due at reservation, each subsequent installment date, and what remains due at closing.
West Tower versus East Tower: two different timelines
The towers sit at different stages, and that changes how a buyer should think about payments. According to REHUB Miami's 2026 guide, which cites Florida YIMBY, the West Tower received its full temporary certificate of occupancy in August 2026 and closings have begun, with the tower reported at about 85 percent sold. A buyer looking at a remaining West Tower residence is therefore dealing with a building that is finished or very nearly so. In that situation, the deposit schedule may be compressed or largely satisfied by the time of contract, and the main planning item becomes the balance due at closing. Confirm directly how any remaining inventory is structured, because the original construction-period schedule may not apply.
The East Tower is the more conventional pre-completion purchase. REHUB Miami's 2026 guide reports that it topped out in March 2026 and is expected to be completed in 2027, with ONE Sotheby's International Realty as its exclusive sales agent. A separate development page from Dora Puig likewise describes the East Tower as continuing toward final completion in 2027.
An earlier construction phasing list on a Sunny Isles Condos page shows the West Tower beginning construction in December 2021 and the East Tower in June 2023, though that page is undated and those were planned start dates. If you are buying into the East Tower, any installment dates tied to construction milestones are worth mapping against the 2027 completion expectation so you know roughly how many payment events fall in each calendar year.
Building a budget around the full cost of ownership
A deposit schedule is only one layer of the capital plan. The South Florida Realtor listing page names several other items to verify before reserving: HOA budget, taxes, insurance and parking. We do not have a dated, source-confirmed figure for any of them at Oasis Hallandale, so they should be requested from the sales team and entered into your own model as line items with a confirmed source. Do not carry forward numbers from third-party aggregator pages, which are undated and may reflect earlier marketing stages.
Price guidance also varies by source and date. A Condo Hotel Center data sheet from the project's early marketing period listed one-bedroom residences of 876, 894 or 937 square feet at a range starting in the mid-$400,000s. South Florida Realtor's listing page cites public guidance of roughly $750,000 to $5.02 million, without giving a date. ONE Sotheby's lists residences from 891 square feet to 6,826 square feet and directs buyers to contact the team for current availability. The spread across those three references is a reminder that older price sheets are not a basis for budgeting; request the current price for the exact residence and its deposit percentages.
For a buyer with irregular income, a useful exercise is to lay out the installment dates against the months in which liquidity is highest, and to leave a cushion for closing-related costs that you have confirmed with the sales team. The goal is a schedule that does not force the sale of assets at an inconvenient moment.
What the residences and amenities are, so you know what the capital buys
Oasis Hallandale occupies a 10-acre site, and according to Arquitectonica's project page, the two 25-story towers each contain 250 residential units, typically 1,843 square feet. The firm describes a mixed-use program with five commercial buildings containing 56,739 square feet of retail and restaurant space, 17,709 square feet of office space and 1,481 parking spaces. REHUB Miami's 2026 guide adds that the commercial frontage is already finished and has tenants, which means the neighborhood context is largely in place even where residences are not.
Amenities listed by Arquitectonica and the developer's website include indoor and outdoor movie theaters, a 21,000-square-foot indoor gym, a ping-pong room, a pool deck and 24-hour lobby attendants. CondoBlackBook's listing adds two swimming pools with cabanas, a children's splash pad, a lounge bar with pool tables, a golf simulator, a mini soccer field, a pet park and a fitness and wellness center across six levels of amenities. For an athlete buyer, the fitness pavilion and on-site wellness amenities are the features most likely to matter in daily use, but you should confirm which amenities are operational in each tower and when.
Residence finishes described by CondoBlackBook include broad balconies with glass railings, floor-to-ceiling windows, walk-in closets, imported Italian cabinetry and frameless glass-enclosed showers. As with every other feature, check the specification sheet for your specific unit rather than relying on a general listing.
Questions to settle before you wire the first installment
Because public information on the project is inconsistent, the best protection is a short list of written confirmations. Ask which tower the residence is in and what the current delivery estimate is for that tower. Ask for the complete installment schedule with dates and amounts, and whether it differs from the 40 percent total described in the early data sheet. Ask what the current balance at closing would be, and which items beyond the purchase price, such as HOA dues, parking and any assessments, you should plan for. Also ask which address the unit carries, since REHUB Miami's 2026 guide notes that West Tower MLS listings use 1170 E Hallandale Beach Blvd while the main project address is 1000 E Hallandale Beach Blvd.
Note also that the sources do not agree on who the developer is: REHUB Miami and the Real Deal's sponsored coverage name Giuseppe Iadisernia, CondoBlackBook lists Romagnole Investment Properties, and one aggregator lists Suffolk, which the early data sheet names as builder. REHUB Miami names MGM Construction Group as general contractor. Confirm the contracting entity and builder in your purchase documents so that your understanding of who you are paying and who is building matches the paperwork.
The developer's website also states that real estate offerings are not available to residents of certain states unless registered or exempt, so buyers should confirm eligibility based on their state of residency early in the process.
A practical way to approach the decision
Oasis Hallandale offers an unusual combination: a finished commercial frontage, a West Tower in closing, and an East Tower still under construction. That gives a buyer a real choice between a nearly immediate purchase and a longer pre-completion one, each with its own cash-flow pattern. Neither is inherently better; the right fit depends on when your capital is available and when you want to take occupancy.
If you would like help comparing the West and East Tower paths, or building a payment calendar around your own schedule, Denis Smykalov and the team at Wolsen Developments can walk through the current public information and help you prepare the questions to bring to the sales team.
Related developments
Sources & references

From the desk of
Denis Smykalov
Founder & Broker · Wolsen
Considering a Miami purchase, resale or new development? Speak directly with Denis for a private consultation.
Frequently Asked Questions
How much is the deposit at Oasis Hallandale?
A Condo Hotel Center data sheet uploaded in January 2020, according to its web address, states that the total deposit will be 40 percent of the purchase price, paid in installments. That sheet predates the residential towers' construction, so the current schedule for a specific residence should be confirmed with the sales team.
Is the deposit paid all at once?
No. The Condo Hotel Center data sheet describes the deposit as broken down in installments, though the available excerpt does not show the individual dates or percentages. Ask for the full schedule in writing.
Which tower is closer to completion?
According to REHUB Miami's 2026 guide, the West Tower received its full temporary certificate of occupancy in August 2026 and closings have begun. The same guide reports that the East Tower topped out in March 2026 and is expected to be completed in 2027.
Who handles sales at Oasis Hallandale?
REHUB Miami's 2026 guide and the Dora Puig development page both state that ONE Sotheby's International Realty leads sales for the East Tower and the project. ONE Sotheby's lists its own sales team on its Oasis Hallandale development page.
How many residences are there?
According to Arquitectonica's project page, there are two 25-story towers with 250 residential units each, for 500 residences in total.
What size are the residences?
ONE Sotheby's lists a range from 891 square feet to 6,826 square feet on its Oasis Hallandale page. Arquitectonica's project page says units are typically 1,843 square feet.
Which amenities are included?
Arquitectonica and the developer's website list indoor and outdoor movie theaters, a 21,000-square-foot indoor gym, a ping-pong room, a pool deck and 24-hour lobby attendants. CondoBlackBook's listing adds two pools with cabanas, a golf simulator, a mini soccer field and a pet park.
Can I rely on the price ranges I see online?
Not without confirmation. An early Condo Hotel Center data sheet lists one-bedroom prices starting in the mid-$400,000s, while South Florida Realtor's undated listing cites public guidance of roughly $750,000 to $5.02 million. Ask the sales team for current pricing on the exact residence.
What should I verify beyond the deposit?
South Florida Realtor's listing advises verifying current availability, deposit schedule, HOA budget, taxes, insurance and parking before reserving. We have no dated, confirmed figures for those items, so request them directly.
Private consultation
Speak With Denis Directly
Discuss the market, a specific development, resale strategy or your next Miami move with Wolsen.